The fast track project was delivered to a 16-week build programme. The steel framed building provided a large showroom space for the sale of new and used cars, together with new office facilities. To the rear of the building a new valet bay and washroom were created. Works comprised part new build, including steel structure, internal dividing walls and intermediate floors, and part refurbishment of redundant garage buildings into a separate body shop and workshop.
Site preparation works and construction of a model Aldi store with in-situ concrete foundations, a steel frame with facing brick infill walls and aluminium composite roof and wall cladding. 278 works involved construction of a mini-roundabout at the site entrance and extensive road and footway improvements including traffic management. Groundworks comprised foul and surface water drainage, including attenuation, in-situ concrete foundations and carpark. Overall, the works packages undertaken by Story were completed 2 weeks earlier than the original completion date.
Working within the site of a live CAT plant assembly and maintenance depot Story undertook demolition of an existing office building and constructed a replacement 2 storey office building and associated car parking and hard landscaping works.
Enabling works consisted of the demolition of former mill buildings (up to 5 storeys high), including removal of asbestos from all structures, together with demolition/reconstruction of a section of the river retaining wall, removal of Japanese Knotweed/associated ground, followed by site preparation works to receive retail units/carparks. The demolitions involved the disconnection and removal of existing services, with new services included in the main retail development.
The works comprised the construction of new Lexus and Toyota showrooms and workshop, a car wash facility and used car sales, with extensive external works including roads, car parking, service yards, car display areas and landscaping on a 4 acre site.
The works comprise the design & construction of a warehouse with a floor area of 5700m², with a portal frame single span width of 44m. Attached to the warehouse is a three storey office building with a floor area of 1850m². The external works include car parks, service roads, service yards and landscaping.
Advanced works prior to construction of Phase 2 Gretna Gateway Outlet Village.
The works comprised the formation of an overspill car park providing 258 car parking spaces. Several thousand tonnes of peat were initially received from the site and then a Marshall Priora permeable paving system laid.
|