Centre for Life, Newcastle upon Tyne
Story's brief was to re-pave the Centre for Life courtyard (1900m2) and incorporate the ‘Life’ logo. Story also carried out rebedding and rejointing of existing Caithness paving flags (70m2).
Story Construction engineers translated the life logo into a herringbone paving design using autocad to produce detailed design drawings, which was subsequently installed by our site operatives.




