Photo: hard hat

Centre for Life, Newcastle upon Tyne

Story's brief was to re-pave the Centre for Life courtyard (1900m2) and incorporate the ‘Life’ logo. Story also carried out rebedding and rejointing of existing Caithness paving flags (70m2).

Click image to open!
Click image to open!
Click image to open!

Story Construction engineers translated the life logo into a herringbone paving design using autocad to produce detailed design drawings, which was subsequently installed by our site operatives.


Web design by Interact Partners